Originally posted by GohnJalt
Forced air heaters (Herman Nelson’s)
Collapse
Logging in...
Welcome to Agriville! You need to login to post messages in the Agriville chat forums. Please login below.
X
-
I have the same setup. In 19 we took all our crop off tough. Worst was over 19 moisture wheat and 16 canola. We ran the heater for 2 months straight, even through -20's C. I would cycle 3000bu grain through a 5000bu bin, rocket air and 7.5 hp fan. 3 days And the wheat would drop 6 points to dry and I'd store it in another air bin and freeze it. Only had 1 load of canola rejected for moisture (1st load) after that I figured out the system. Good God that was a long 2 months but worth the effort.
- Reply to this Thread
- Return to Topic List
Comment